ARTCOR – Creative Industries Center is located in the historical center of Chisinau in the courtyard of the Art Academy (AMTAP). The center is set to become a place for developing the environment of creative industries of Moldova.
The spatial solution of the building was determined by the configuration of the plot position, the presence of an architectural monument, dated by the late 19th century and neighbor buildings.
The center includes a new building – 400 m² and a part of the old Academy building – 450 m². A part of the site area (1200 m²) was occupied by old storage and jerry-building covering a total of 300 m², the demolition of which opened up the additional space for public use.
Mixed-use of cultural and business space had been designed in a new building, also the second floor is offering a space for workshops and startup collaborations. The roof represents a green terrace with access through the open-air auditorium stairs, which are oriented to the Cazimir-Keshco residential monument.
The left part of the first floor of the Academy’s building (built in the 1950s) includes spaces for workshops, media library, and meeting rooms. In addition, were added highlighted spaces for the administration of the center, book, and design shop. The musical part, consisting of sound recording space and rehearsal rooms, has been moved in the refitted basement.
The task was to preserve the historical background as much as possible, but also, on the other hand, the goal was to create a mixed space. The architect, achieved an active urban space by transforming the courtyard into an active urban zone, accessible for all visitors, also making the building useful by making the roof exploitable.
The landscape emphasized with the greenery and art space, the urban furniture of the place appears as an art installation.
At the entrance from the driveway, it can be seen the sculpture “The Knowledge Tree” that shows the origin of creation. The courtyard plot has been cut by the “Stone rivers”, that are used as a sewer of the stormwater.
The new construction represents a volume of reinforced concrete, covered with Corten-steel; on the concrete façade, the bas-reliefs fragments are symbolizing the human nature.
The accent in the interior is given by the building’s constructive structure – a caisson ceiling, internal auditorium staircases, and the surface of the walls made in tinted concrete. The furniture and part of ceiling lighting were designed by the author, especially for this center. In the creation of decorative elements for the center, the architect worked closely with the students, artists and Academy’s professors. Moderate interior design allows visitors to focus their attention on the exhibited art-works.
ARTCOR was created to consolidate the creative processes that are taking place in Chisinau, developing in such a way the creative industry of the country. Over time, the center is supposed to become a point of attraction for urban tourist routes.
Project Info:
Architects: Maxim Calujac
Architect in Charge: Maxim Calujac
Design Team: Irina Dubinschi, Anton Brenici
Area: 850.0 m2
Project Year: 2019
Photographs: Volker Kreidler
Manufacturers: Nayada, Autodesk
Project Name: ARTCOR Creative Center
https://www.arch2o.com/artcor-creative-center-maxim-calujac/ October 08, 2019 at 04:05PM https://www.arch2o.com/wp-content/uploads/2019/07/Arch2O-ARTCOR-Creative-Center-Maxim-Calujac-08-700x525.jpg
No comments:
Post a Comment