Shenyang Taoxian International Airport Terminal 3
The year of completion for Terminal 3 was 2013. On the basis of T1 and T2 with existing 7.5 MAP, T3 was supposed to meet the 17.5million passenger demand in 2020 with 6,430 passengers in peak hour (5,130 domestic passengers and 1,300 international passengers). Combined together, T1, T2 and T3 can meet the demand of 25 million passengers in 2020.
Shenyang Taoxian Airport is one of the key airports in North China, and the new T3 will not only enhance the capability of air transportation and service quality, but also improve the integrated transportation system in Shenyang.
It will also expand the economic exchange, improve environment for investment and facilitate rapid economic growth and development in Northeast old industrial base. Meanwhile, the passenger friendly designing philosophy has strong demonstration effect and will inspire the designing of terminals in the future.
Project Info
Architects: China Northeast Architectural Design and Research Institute
Location: Liaoning, China
Architect in Charge: REN Bingwen
Main Architecture Designer: SHAO Mingdong, YAN Yi, ZHI Yu
Type: Airport
Photographs: Courtesy of CNADRI
https://www.arch2o.com/shenyang-taoxian-international-airport-terminal-3-cnadri/ November 17, 2019 at 04:00PM https://www.arch2o.com/wp-content/uploads/2017/03/ARCH2O-Shenyang-Taoxian-International-Airport-Terminal-3-CNADRI-03-600x400.jpg
No comments:
Post a Comment