Arch2O.com
Arch2O.com - Architecture & Design Magazine
Shenyang Taoxian International Airport Terminal 3 The year of completion for Terminal 3 was 2013. On the basis of T1 and T2 with existing 7.5 MAP, T3 was supposed to meet the 17.5million passenger demand in 2020 with 6,430 passengers in peak hour (5,130 domestic passengers and 1,300 international passengers). Combined together, T1, T2 and […]
The post Shenyang Taoxian International Airport Terminal 3 | CNADRI appeared first on Arch2O.com.
http://www.arch2o.com/shenyang-taoxian-international-airport-terminal-3-cnadri/ March 26, 2017 at 10:00PM http://ifttt.com/images/no_image_card.png
No comments:
Post a Comment