Designed by C.F. Møller Architects, the Greenwich Peninsula Low Carbon Energy Centre houses technically advanced boilers and CHP that provide heat energy to the businesses and homes due to be built on the Peninsula in the coming years and is part of the Peninsula’s Sustainability Strategy.
The Energy Centre was a Response to a cross-party drive to increase the use of Combined Heat & Power (CHP) across the UK and to realize a vision of decentralized energy power generation in London. It is the largest new build residential heat network in Europe, saving over 20,000 tonnes of carbon every year.
The 3000 m2 Low Carbon Energy Centre, situated in a prominent location at the entrance to the peninsula, adjacent to the Blackwall Tunnel Approach, is a highly visible and important new landmark that demonstrates the applicants’ and stakeholders’ commitment to sustainable and affordable energy for all. Heat energy will be distributed via a District Heating Network (DHN) from the Energy Centre to each plot across the development.
Designed by British artist Conrad Shawcross, the cladding of the 49 metre high stack tower unites sophisticated engineering and complex optic research to create an impressive sculptural concept on a huge scale: The cladding for the structure is formed of hundreds of triangular panels that fold and flow across the surface of the tower forming complex geometric patterns that visually break up the flat planes to create an uneven, sculpted surface that plays with the vanishing points and perspective.
The panels are perforated so as to exploit the phenomena of the Moiré Effect, and at night an integrated lighting design produces a shifting series of ‘compositions‘ lit from within the structure.
To demystify the process of energy generation, the Energy Centre’s machine room and flexible ancillary office accommodation are supplemented with a Visitor Centre offering an interactive educational experience for prearranged groups of visitors. Construction started in 2015 and was completed in 2016. The building footprint further allows for flexibility in adopting new energy technology over the building’s substantial lifetime.
Project Info:
Architects: C.F. Møller Architects
Location: Greenwich, London SE10, United Kingdom
Area: 2650.0 m2
Project Year: 2017
Manufacturers: Metal Surgery, Shuco, QBISS
Engineering: Buro Happold (Environmental), Ove Arup (Infrastructure), Price & Myers (Structural)
Artist: Conrad Shawcross
Landscape Architect: C.F. Møller Landscape
Client: Pinnacle Power and Knight Dragon Developments
Client Consultant: RPS Group Atlas Commercial Consultants Limited
Photographs: Mark Hadden
Project Name: Greenwich Peninsula Low Carbon Energy Centre
The post Greenwich Peninsula Low Carbon Energy Centre | C.F. Møller Architects appeared first on Arch2O.com.
https://www.arch2o.com/greenwich-peninsula-low-carbon-energy-centre-c-f-moller-architects/ September 12, 2018 at 04:30PM https://www.arch2o.com/wp-content/uploads/2018/09/Arch2O-C.F.M%C3%B8llerArchitects-GreenwichPeninsulaLowCarbonEnergyCentre-15-700x560.jpg
No comments:
Post a Comment